What if we have models over the period of 6 months showing different connections and different conditions – there is no way to make amendments so these need to be experiments
- Water
- Soaked
- Dripping
- Constant flow (water pump)
- Effect of water on timber
- Heated environment
- Timber in Brick & Mortar
- What is the material of the mortar
- What kind of brick
- What kind of configuration of brick
- Brick in Timber
- Concrete in Timber
- Steel in Timber
- This can be a whole system of water flow testing different materials and joints
The models should also be made in three parts
- Masterplan level (city)
- Design level (region)
- Material level (room)